Fixed link cost could exceed £400m, says industry expert – Shetland Times
Fixed link cost could exceed £400m, says industry expert Shetland Times
For Shetlanders and Shetland Interest
Fixed link cost could exceed £400m, says industry expert Shetland Times
Constructing tunnel to Yell could require budget of £400m, estimates suggest Shetland News
A survey on the potential landfall site for the proposed Shetland HVDC Link 2 has been extended.
“Dream Job” for former librarian at Shetland Bookshop
Proved right within a fortnight Shetland News
SSEN extends survey on potential HVDC landfall site Shetland Times
Scottish salmon firm fined £70,000 by environmental watchdog over breaches The National Scot
Marine survey work to assess additional Shetland HVDC Link 2 landfall location Project Scotland
New chapter for beloved Lerwick bookshop as Natasha Watt takes over as the new manager Shetland Times
‘Shocks in the system’ led to Heathrow route being scrapped Shetland News